Bathroom Remodeling in Seattle, WA
Waterproof showers, custom tile, vanities, lighting, and ventilation—planned clearly, built cleanly, and made to last.
Prefer to call? (425) 616-6656
What we remodel
From refreshes to full rebuilds, we help you select durable materials and a realistic schedule that fits how you live.
Need plumbing only? See Plumbing →- Showers & tubs — walk-in, curbless, conversions, drains, and glass enclosures.
- Tile & waterproofing — substrates, membranes, epoxy grout, and sealed transitions.
- Vanities & countertops — storage planning, quartz tops, plumbing integration.
- Flooring — porcelain tile, LVP, subfloor prep, and heating considerations.
- Lighting & electrical — task lighting, GFCI, code-compliant circuits via licensed electricians.
- Ventilation — appropriately sized fans, duct routing, and moisture control.
- Plumbing integration — supply/drain lines, shutoffs, pressure tests, and fixture installs.
- Permits & coordination — scheduling inspections and guiding paperwork.
Waterproofing systems that last
Moisture protection starts behind the tile. We pair substrates, membranes, slopes, and joints to keep water where it belongs.
- Substrate & membrane pairings matched to design and local code.
- Taped seams, sealed fasteners, and properly flashed niches.
- Correct slopes to linear or center drains with flood testing as needed.
- Epoxy or high-performance grout with flexible movement joints.
Materials & fixture guidance
Surfaces
- Porcelain tile — low maintenance, wide formats
- Ceramic tile — versatile, cost-effective
- Quartz countertops — durable and easy to clean
- Epoxy grout — stain-resistant and color-stable
Fixtures
- Water-saving faucets & showerheads (WaterSense)
- Quality valves and cartridges with serviceable parts
- Quiet, code-compliant ventilation fans
- ADA/universal options such as grab bars and lever handles
Bathroom remodeling process
- 1
Consultation & Measure
Understand goals, constraints, and site conditions with measurements and photos.
- 2
Design & Estimate
Review layout options, waterproofing systems, and fixtures with a detailed quote.
- 3
Permits & Scheduling
Coordinate permits, inspections, and trade sequencing to minimize downtime.
- 4
Build, Protect & Communicate
Dust control, floor protection, frequent updates, and tidy job sites each day.
- 5
Final Walkthrough & Warranty
Review punch list, confirm finishes, and share warranty and care guidance.
Featured bathroom projects
See how clean lines, proper waterproofing, and detailed finishes come together.
Bathroom remodeling FAQs
How long does a bathroom remodel take?
Smaller updates may wrap in a few weeks, while full rebuilds vary with scope, inspections, and material lead times. Estimates include a realistic schedule.
Do you handle permits and inspections?
Yes. We advise on requirements, pull permits where needed, and prepare the site for inspections.
Can we use the bathroom during the remodel?
Access is limited for safety and efficiency. We help plan temporary arrangements and communicate milestones in advance.
What waterproofing systems do you use?
We pair cement or foam backer boards with liquid or sheet membranes matched to your design and code requirements.
Do you provide plumbing and electrical work?
Yes. Plumbing integrates within our scope and we coordinate licensed electricians for lighting and circuits.
Are you licensed and insured? Do you offer a warranty?
Yes—licensed, insured, and backed by workmanship warranty details included in your estimate.
Code & compliance
We follow local building codes and manufacturer guidelines. When inspections are required, we coordinate scheduling, paperwork, and site readiness for a smooth walk-through.
